FROM PLANNING TO PERFORMANCE: ASSESSING THE ROLE OF MILESTONE SCHEDULING IN GARMENT ENTERPRISES IN ELDORET TOWN, KENYA
DOI:
https://doi.org/10.46827/ejmms.v9i2.1826Klíčová slova:
scheduling, milestone, garment, planning, performanceAbstrakt
The performance of garment enterprise projects is a critical indicator of the economic progress and sustainability of any country. With respect to small garment enterprises in Eldoret town, data has shown suboptimal performance in the industry, resulting in some SMEs ceasing their operations. The aim of this paper is to assess the effect of scheduling milestones on the performance of small-scale garment enterprise projects in Eldoret town. The study was anchored on the Goal Setting Theory. An explanatory research design was used, and the target population consisted of 386 small-scale garment enterprise owners. A sample size of 196 small-scale garment enterprise projects in Eldoret town was selected. The respondents were selected using a stratified sampling method, and data was collected using questionnaires. The analysis was done using both descriptive and inferential statistics. With respect to findings, mapping risks was found to have a significant positive effect on the performance of garment enterprise projects (β 0.968, p<0.05). Milestone scheduling has a significant positive impact on the performance of garment enterprises in Eldoret town. The study recommends that small-scale garment enterprise projects prioritize the efficient use of their available resources and develop detailed production schedules.
Article visualizations:
Reference
AlNasseri, H. A. (2015). Understanding applications of project planning and scheduling in construction projects. Doctoral Thesis, Lund University. Retrieved from https://www.lunduniversity.lu.se/lup/publication/160185bb-849e-4cd5-8bbf-0f0804e7db06
Baldwin, A. & Bordoli, D. (2018). A handbook for construction planning and scheduling. John Wiley & Sons. Retrieved from https://onlinelibrary.wiley.com/doi/book/10.1002/9781118838167
Belout, A. & Gauvreau, C. (2021). Factors influencing project success: The impact of human resource management. International Journal of Project Management, 22(1), 1 – 11. Retrieved from http://dx.doi.org/10.1016/S0263-7863(03)00003-6
Carson, S. (2020). Performance measurement techniques: An overview. Performance Improvement Journal, 59(2), 14-28.
Cleland, D. I. & Ireland, L. R. (2022). Project management: strategic design implementation. New York: McGraw-Hill. Retrieved from https://www.accessengineeringlibrary.com/content/book/9780071471602
De Toni, A. F., & Tonchia, S. (2021). Scheduling milestones and managing operational efficiency. Production and Operations Management, 30(3), 449-463.
Evans, M. (2018). The rise of enterprise performance studies. Journal of Business & Economic Research, 16(2), 89-104.
Fekete, I. (2012). Does lost time cost you money and create high risk. Retrieved from https://www.researchgate.net/publication/277879728_Does_Lost_Time_Cost_You_Money_and_Create_High_Risk
Gorod, A., Leonie, H., & Tiep, N. (2018). A systematic approach to complex project management: Integration of command and control and network governance. Systems Research and Behavioural Science, 35. http://dx.doi.org/10.1002/sres.2520
Hildreth, J., & Munoz, J. (2019). Citation on scheduling process and planning. Journal of Project Management, 12(1), 45-60.
Ika, L., Soderlund, J., Munro, L., & Landoni, P. (2020). Cross-learning between project management and international development: Analysis and research agenda. International Journal of Project Management, 38(8). http://dx.doi.org/10.1016/j.ijproman.2020.10.005
Kerzner, H. (2023). Project Management: A Systems Approach to Planning, Scheduling, and Controlling (13th ed.). Wiley. Retrieved from https://www.wiley.com/en-fr/Project+Management%3A+A+Systems+Approach+to+Planning%2C+Scheduling%2C+and+Controlling%2C+13th+Edition-p-9781119805373
Lehtinen, U. (2022). Study on performance measurement in enterprises. Journal of Business Performance, 20(3), 134-150.
Leung, S., Mo, P., Ling, H., Chandra, Y & Ho, S. S. (2019). Enhancing the competitiveness and sustainability of social enterprises in Hong Kong: A three–dimensional analysis. China Journal of Accounting Research, 12(2), 157-176. http://dx.doi.org/10.1016/j.cjar.2019.03.002
Lohman, C., Fortuin, L., & Wouters, M. (2018). Designing a performance measurement system. A case study. European Journal of Operational Research, 156(2), 267-286. http://dx.doi.org/10.1016/S0377-2217(02)00918-9
Meredith, J. R., Shafer, S. M. & Mantel, S. J. (2021). Project management: A managerial approach (11th Ed.). Hoboken, NJ: Wiley. Retrieved from https://www.wiley.com/en-kr/Project+Management%3A+A+Managerial+Approach%2C+11th+Edition-p-9781119803836
Morris, P., Pinto, J. & Soderlund, J. (2020). The Oxford handbook of project management, New York: Oxford University Press.
Shenhar, A. J., Dvir, D. D., Levy, O., & Maltz, A. C. (2020). Project success: A multidimensional strategic concept. Long Range Planning, 34(6), 699-725. http://dx.doi.org/10.1016/S0024-6301(01)00097-8
Sriram, C. & Haghani, A. (2003). An optimization model for aircraft maintenance scheduling and re-assignment, Transportation Research Part A: Policy and Practice, vol. 37(1). Retrieved from https://ideas.repec.org/a/eee/transa/v37y2003i1p29-48.html
Soderlund, J. (2020). Seven insights into becoming an engaged project scholar. Project Management Journal, 54(5). https://doi.org/10.1177/87569728231205636
Solis, R., Corona-Suarez, G., & Garcie, J.A. (2015). The use of project time management processes and the schedule performance of construction projects in Mexico. Journal of Construction Engineering, 1, 1-9. Retrieved from http://dx.doi.org/10.1155/2015/868479
Turner, J. R. (2022). Handbook of project-based management: Leading strategic change in organisations (5th Ed.). New York: McGraw-Hill. Retrieved from https://www.accessengineeringlibrary.com/content/book/9780071549745
Winch, G., & Kelsey, J. (2021). What do construction project planners do? International Journal of Project Management, 23(2). https://doi.org/10.1016/j.ijproman.2004.06.002


